Gerresheimer - Supply chain redesign, outsourcing of shipping logistics

References
Image
Image
Image
Image
Image
Background

Gerresheimer Bünder Glas is a leading manufacturer of primary packaging made of glass or plastic (droppers, syringes, bottles, etc.) for the pharmaceutical industry. The subsidiary generates sales of approximately €70 million per annum. As a result of the "Production Restructuring, New Construction/Expansion of Factory Facilities" project, the plant will be completely restructured and converted to production islands. Parts of the new proposed structure are:

  • outsource the finished goods warehouse and the entire shipping process to a logistics service provider
  • redesign the warehouse for raw materials and semi-finished products and relocate it to the production area

PI was commissioned to redesign the logistics and shipping process and implement the concept, including outsourcing to a logistics service provider.

Results
  • Space savings through outsourced finished goods warehouse
  • Increased efficiency in the shipping process through outsourcing to a logistics service provider and simple billing based on unit costs
  • Increased efficiency through improved location and design of the warehouse for raw materials and semi-finished products
  • Savings:
    • Costs approx. 15% annually,
    • Investments approx. €2.6 million (through conversion of vacant warehouse)
PI services

logistics planning

Concept design
analogous to VDI 5200, phases 1 to 3

  • Detailed business process for shipping with external service providers; topics include
    • Handling and tracking of finished goods (barcode)
    • Transport scheduling
    • Service provider billing
  • Interfaces to logistics service providers defined
  • IT systems defined
  • Logistics services (storage, order picking and transport) specified on the basis of unit prices, put out to tender and 8 bids prepared ready for award
  • 3 logistics service providers audited
  • Conversion measures for warehouse and conveyor technology (raw materials, semi-finished products) specified, put out to tender, bids obtained and prepared ready for award
  • Detailed budget and implementation schedule

Detailing
analogous to VDI 5200, phases 4 and 5

  • Warehousing and conveyor technology (raw materials, semi-finished products) specified
  • Outsourcing logistics outbound (finished goods warehouse + order picking) specified, put out to tender and prepared for awarding
  • Interfaces to logistics service provider defined
  • Budget and schedule created, project controlling established

Implementation
analogous to VDI 5200, phases 6 and 7

  • Supplier performance monitored and approved
    • Relocation/integration of existing systems
  • Outsourcing of outbound logistics implemented 
  • Budget (investments) tracked
Topics

Process design: Process cost calculation, make-or-buy, distribution network, outsourcing

Logistics planning: Material supply strategy by part, simulation of movements/inventories, load carrier design, conveyor technology: Warehouse technology/transport technology

Logistics consulting: Supply chain management

Gerresheimer AG
Supply chain redesign, outsourcing of shipping logistics
Product
Glass and plastic systems for pharmaceuticals and medical technology
Location
Bünde
Project period:
12 months